If one power line fails, does anything overload?

An AI ranks all 80 possible line failures on the IEEE 57-bus grid in about 0.15 s. The exact solver then checks only the risky ones. The AI sorts, the solver decides.

Try it: pick a day, press Run. First you see which lines the AI sends to the solver, then the solver's real answer for each, and whether any dangerous line slipped through.

not sent sent to the solver dangerous, caught dangerous, missed ■ generator bus
Total load
-
Sent to the solver
-
of 80 lines
Dangerous (solver says)
-
of 80 lines
Missed by the AI
-
dangerous but not sent
Press Run to start.

What these results do and do not show